Stories by state (sprints)

About this report

The stories by state report shows how many stories are in each state (In Progress, Dev Complete, Test Complete, Accepted) for a specific sprint. The report provides this information in the form of a line graph. Information is graphed on an X and Y axis, using data points connected by line segments. This report is beneficial to Scrum Masters, team leaders and members, and product owners to compare volumes as stories progress through the various states during a sprint. It is beneficial to review the report with team members during sprint review meetings and daily standups. This report is generated by selecting a specific PI and sprint. 

To navigate to this report:

  1. Select Teams in the top navigation bar and select the team you want to view information about.
  2. On the sidebar, select Reports in the list of options.
  3. Select Stories by state; the report displays.

Prerequisites

  1. PI must exist in the system, and be tied to a program. 
  2. Sprints must be created and tied to a PI. 
  3. Teams must be created and tied to a program. 
  4. Stories must be assigned to sprints. 

How are report values calculated? 

  • Story state is pulled from the stories page/New Story panel, or Kanban board, if category/column is mapped to work item state when used.
  • Sprint dates are pulled from the sprint list/New Sprint panel.

Stories_by_State__Sprints__Final.png

How to interpret this report

Charting the life cycle of a user story is vital for checking the status of development and team velocity in a sprint. The goal of any sprint is to have or all of the team's stories in an Accepted state by the end of the sprint, which is desired before the sprint retrospective. Accepted stories demonstrate that all acceptance criteria have been met by the sprint team, and deadlines are being met. Scrum Masters and product owners should look for a steady cadence of stories moving through the life cycle during a sprint, as opposed to high volumes of testing and acceptance taking place at the end of a sprint. 

Was this article helpful?
0 out of 0 found this helpful
Print Friendly Version of this pagePrint Get a PDF version of this webpagePDF

Join the Atlassian Community!

The Atlassian Community is a unique, highly collaborative space where customers and Atlassians come together. Ask questions and get answers, start discussions, and collaborate with thousands of other Jira Align customers. Visit the Jira Align Community Collection today.

Need to contact Jira Align Support? Please open a support request.