Assign costs to cost centers to see the cost of hours spent on those cost centers. This information is then used calculating costs for a story. For example, you can calculate each story cost based on the development efforts.
Note: For information on how to create cost centers, see the Create Cost Centers topic.
To assign cost to a cost center:
- Select the Settings gear in the top navigation bar.
- On the left side of the page, select Cost Centers in the Settings section.
- Select the name of the cost center you want to assign a cost to. A details panel will display.
- In the Hourly rate ($) field, type an hourly rate for the cost center, and then click Save.