Set up projects and allocation to a PI to see the total breakdown cost based on the spent hours.
Note: This functionality is used together with work codes and time entry.
To set up a PI cost:
- If you’re using the new navigation, select the Settings gear
in the top navigation bar. If you’re using the old navigation, select Administration in the left Nav menu.
- On the left side of the page, select Report Baseline in the Settings section.
- Select a program increment to which to allocate costs from the corresponding drop-down menu on the Configuration bar on the top.
- In the Billing Codes box, select the billing codes to assign to the PI, and then click the right arrow to move them to the Selected Billing Codes box.
- In the Cost box, type a rate for each billing code.
- Click Save.
Join the Atlassian Community!
The Atlassian Community is a unique, highly collaborative space where customers and Atlassians come together. Ask questions and get answers, start discussions, and collaborate with thousands of other Jira Align customers. Visit the Jira Align Community Collection today.
Need to contact Jira Align Support? Please open a support request.